Таблица | Карточка | RUSMARC | |
Разрешенные действия: Прочитать Загрузить (1,4 Мб) Группа: Анонимные пользователи Сеть: Интернет |
Аннотация
The paper is devoted to earned value management, it describes the basic tools of this method, particular attention is directed to the indicators of the deviation of the time of the project. Also reasons for not using the method in practice are revealed. The main problem of the method of earned value management – the impossibility of its application to project time control, analyzed ways to solve this problem, were identified. It is revealed that the method proposed by Lipke, is not suitable for the project, where the cost of critical activities is low. The conclusions are about the possibility of using the method for the project time control.
Представлен метод управления освоенным объёмом в контроле сроков проекта. Описаны основные инструменты данного метода, особое внимание направлено на показатели отклонения сроков проекта. Также выявлены причины отказа от использования метода на практике. Выявлена основная проблема метода управления освоенным объёмом – невозможность его применения для контроля сроков проекта, проанализированы пути решения этой проблемы.
Права на использование объекта хранения
Входит в состав
Статистика использования
Количество обращений: 451
За последние 30 дней: 7 Подробная статистика |