Details

Title: Реконструкция подстанции 35/6 кВ Фёдоровского месторождения: выпускная квалификационная работа бакалавра: направление 13.03.02 «Электроэнергетика и электротехника» ; образовательная программа 13.03.02_13 «Передача и распределение электрической энергии, системы электроснабжения»
Creators: Мирясов Фарид Нуриманович
Scientific adviser: Чудный Владимир Сергеевич
Other creators: Першиков Георгий Анатольевич
Organization: Санкт-Петербургский политехнический университет Петра Великого. Институт энергетики
Imprint: Санкт-Петербург, 2020
Collection: Выпускные квалификационные работы; Общая коллекция
Subjects: подстанция; трансформатор; электрические нагрузки; молниезащита и заземление; substation; transformer; electrical loads; lightning protection and grounding
Document type: Bachelor graduation qualification work
File type: PDF
Language: Russian
Level of education: Bachelor
Speciality code (FGOS): 13.03.02
Speciality group (FGOS): 130000 - Электро- и теплоэнергетика
Links: Отзыв руководителя; Отчет о проверке на объем и корректность внешних заимствований
DOI: 10.18720/SPBPU/3/2020/vr/vr20-1105
Rights: Доступ по паролю из сети Интернет (чтение)
Record key: ru\spstu\vkr\6519

Allowed Actions:

Action 'Read' will be available if you login or access site from another network

Group: Anonymous

Network: Internet

Annotation

Задачей выпускной квалификационной работы является реконструкция подстанции 35/6 кВ Фёдоровского месторождения. Подстанция расположена в Ханты-Мансийском Автономном округе Тюменской области вблизи города Сургута и была построена в 1994 году. Основными потребителями электроэнергии являются электрооборудование кустов добычи углеводородного сырья, разведочное и эксплуатационное бурение на нефть и на газ, погружные насосы и станции по перекачки попутного газа, цеха подготовки и перекачки нефти, освещение, дожимные насосные и кустовые насосные станции, ремонтномеханические мастерские. В связи с использованием новых технологий активно вовлекаются в разработку объекты с трудно извлекаемыми запасами, согласно перспективной карте бурения и вводом новых кустов скважин требуется увеличение передаваемой мощности от данной подстанции и повышение надежности электроснабжения Фёдоровского месторождения. Реконструкция крайне актуальна, так как подстанция морально и технически устарела. В нашей стране промышленные предприятия добычи и переработки — это основные потребители электрической энергии. На их долю приходится около 75% вырабатываемой электроэнергии в стране, большую часть потребления электроэнергии берёт на себя нефтяная промышленность. Современная нефтедобыча имеет огромное и современное электрохозяйство. Вся добыча нефти с применением насосов, гидроразрыв пластов, закачка воды в пласты для поддержания пластового давления, перекачка нефти и газа по трубопроводам и водоснабжение полностью электрифицированы. Почти 70% глубокого бурения производится буровыми установками с электроприводом. На основании анализа исходных данных был выполнен расчет нагрузок понижающей подстанции 35/6 кВ Фёдоровского месторождения, осуществлён выбор и расчет мощности силовых трансформаторов, расчет и выбор силового оборудования, конденсаторных установок, микропроцессорных устройств релейной защиты и автоматики, выполнен расчет заземляющего устройства подстанции, а также рассчитаны токи короткого замыкания. Структура работы представлена введением, 5 главами, заключением и списком использованных источников. В работе использовано 5 таблиц, 16 рисунков. Общее количество страниц выпускной квалификационной работы – 59.

The task of final qualification work is the reconstruction of the substation 35/6 kV Fedorovsky field. The substation is located in the Khanty-Mansiysk Autonomous Okrug of the Tyumen Region near the city of Surgut and was built in 1994. The main consumers of electricity are electrical equipment for hydrocarbon production clusters, exploration and production drilling for oil and gas, submersible pumps and associated gas pumping stations, oil treatment and pumping workshops, lighting, booster and cluster pumping stations, and repair shops. In connection with the use of new technologies, objects with hard-to-recover reserves are actively involved in the development, according to a prospective drilling map and the commissioning of new well clusters, an increase in the transmitted power from this substation and an increase in the reliability of power supply to the Fedorovsky field are required. Reconstruction is extremely relevant, since the substation is morally and technically outdated. In our country, industrial enterprises of extraction and processing are the main consumers of electric energy. They account for about 75% of the generated electricity in the country, most of the electricity consumption is taken by the oil industry. Modern oil production has a huge and modern electrical facilities. All oil production using pumps, hydraulic fracturing, pumping water into reservoirs to maintain reservoir pressure, pumping oil and gas through pipelines, and water supply are fully electrified. Almost 70% of deep drilling is carried out by electric drilling rigs. Based on the analysis of the initial data, the loads of the 35/6 kV lowering substation of the Fedorovsky field were calculated, the power of power transformers was selected and calculated, the power equipment, capacitor units, microprocessor relay protection and automation devices were calculated and calculated, the substation's grounding device was calculated, and short circuit currents are calculated. The structure of the work is presented by introduction, 5 chapters, conclusion and list of sources used. The work used 5 tables, 16 figures. The total number of pages of the final qualification work is 59.

Document access rights

Network User group Action
ILC SPbPU Local Network All Read
Internet Authorized users SPbPU Read
-> Internet Anonymous

Table of Contents

  • 7
  • Введение……………………………………………………………………..
  • 11
  • 1. Краткое описание объекта реконструкции……………………………..
  • 11
  • 2. Технические данные объекта реконструкции………………....……….
  • 13
  • 3. Расчёт и выбор силового оборудования…………………………….......
  • 13
  • 3.1. Расчёт мощности силовых трансформаторов………..……………….
  • 15
  • 3.2. Выбор силовых трансформаторов…………………...……...………...
  • 18
  • 21
  • 3.4. Выбор коммутационных аппаратов……………....…………………..
  • 27
  • 3.5. Выбор выключателей 35 кВ…………………………………………...
  • 28
  • 3.6. Выбор разъединителей 35 кВ………………………………………….
  • 29
  • 3.7. Выбор ограничителей перенапряжения 35 кВ……………………….
  • 30
  • 3.8. Выбор ограничителей перенапряжения 6 кВ………………………...
  • 31
  • 3.9. Выбор комплектного распределительного устройства 6 кВ………..
  • 32
  • 3.10. Выбор выключателей 6 кВ…………………………………………
  • 35
  • 3.11. Выбор измерительных трансформаторов напряжения 6 кВ……….
  • 36
  • 3.12. Выбор измерительных трансформаторов тока 35 кВ………………
  • 37
  • 3.13. Выбор измерительных трансформаторов тока 6 кВ………………..
  • 37
  • 3.14. Проверка гибких токопроводов……………………………………...
  • 38
  • 3.15. Проверка сечения проводов ВЛ 35 кВ………………………………
  • 39
  • 3.16. Выбор трансформаторов собственных нужд……………………….
  • 3.17. Выбор микропроцессорных устройств релейной защиты и автоматики……………………………………………………………
  • 40
  • 44
  • 4. Расчёт баланса мощности………………………………………………..
  • 45
  • 4.1. Выбор конденсаторных установок и батарей статических конденсаторов………………………………………………………......
  • 49
  • 5. Расчет заземляющего устройства подстанции........................................
  • 57
  • Заключение………………………………………………………………….
  • 58
  • Список используемых источников………………………………………...
  • ВВЕДЕНИЕ

Usage statistics

stat Access count: 3
Last 30 days: 0
Detailed usage statistics