Details

Title: The combination of bamboo grid and concrete pile as soil reinforcement under the embankment // Magazine of Civil Engineering. – 2021. – № 6 (106). — С. 10610
Creators: Waruwu A.; Deni Susanti R.; Napitupulu N.; Oges Sihombing J.
Imprint: 2021
Collection: Общая коллекция
Subjects: Строительство; Основания и фундаменты; soils; soil under embankment; soil reinforcement; concrete piles; bamboo nets; ground loads; грунты; грунты под насыпью; укрепление грунтов; бетонные сваи; бамбуковые сетки; грунтовые нагрузки
UDC: 624.1
LBC: 38.58
Document type: Article, report
File type: PDF
Language: English
DOI: 10.34910/MCE.106.10
Rights: Свободный доступ из сети Интернет (чтение, печать, копирование)
Record key: f8dd401c-3d6a-456f-b2d0-e4468d04ab9c

Allowed Actions: Read Download (0.6 Mb)

Group: Anonymous

Network: Internet

Annotation

Material availability and economic price make bamboo a viable option for soil reinforcement. Grids made of split bamboo rods require reinforcement with concrete piles, which are known to have a good bearing capacity under the embankment. The combination of these materials allows reducing the settlement and deflection of the bamboo grid as a subgrade on peat. However, research is needed to get the distance and length of a pile that can provide significant performance in supporting the embankment load. In this research, the pile system with diameters of 2 cm was driven into the peat layer to a certain length and distance. The piles have a length of 15 cm and 25 cm in peat soil layers. The piles were connected monolithically with a bamboo grid using a wire. The pile’s distance was 5–20 cm. The peat soil was compacted layer by layer with a total thickness of 50 cm close to the field density. The embankment load was applied in three stages over one day with pressure of 3.02 kPa at each stage. The reinforcement proved to reduce the settlement and the deflection of the bamboo grid. The results showed that the combination of grid bamboo with concrete piles can be used for reinforcement purposes on peat soils on the following conditions: if L/H = 0.3, the ratio s/d less than/equal to 2.5; if L/H = 0.5, the ratio s/d less than/equal to 7.5.

Document access rights

Network User group Action
ILC SPbPU Local Network All Read Print Download
-> Internet All Read Print Download

Table of Contents

  • The combination of bamboo grid and concrete pile as soil reinforcement under the embankment
    • 1. Introduction
    • 2. Methods
    • 3. Results and Discussion
    • 4. Conclusion
    • 5. Acknowledgement

Usage statistics

stat Access count: 125
Last 30 days: 6
Detailed usage statistics