Details

Title: Система инвестиционного контроля строительства на основе трёхмерной параметрической модели здания: выпускная квалификационная работа специалиста: направление 08.05.01 «Строительство уникальных зданий и сооружений» ; образовательная программа 08.05.01_01 «Строительство высотных и большепролетных зданий и сооружений»
Creators: Монастырева Дарья Евгеньевна
Scientific adviser: Астафьева Наталья Серафимовна
Other creators: Андреева Дарья Сергеевна
Organization: Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт
Imprint: Санкт-Петербург, 2021
Collection: Выпускные квалификационные работы; Общая коллекция
Subjects: информационное моделирование; extensible storage; revit api; bim; инвестиционный контроль строительства; information modeling; investment control of construction
Document type: Specialist graduation qualification work
File type: PDF
Language: Russian
Level of education: Specialist
Speciality code (FGOS): 08.05.01
Speciality group (FGOS): 080000 - Техника и технологии строительства
Links: Отзыв руководителя; Рецензия; Отчет о проверке на объем и корректность внешних заимствований
DOI: 10.18720/SPBPU/3/2021/vr/vr21-991
Rights: Доступ по паролю из сети Интернет (чтение)
Record key: ru\spstu\vkr\13315

Allowed Actions:

Action 'Read' will be available if you login or access site from another network

Group: Anonymous

Network: Internet

Annotation

Данная работа посвящена повышению уровня контроля инвестиций в строительство, а также качества управления процессом актирования выполненных строительно-монтажных работ с использованием Extensible storage (Revit API). Задачи, которые решались в ходе исследования: 1. Анализ научно-технической и нормативной литературы по данной тематике; 2. Разработка методики управления инвестициями в строительство, а также их контроля с применением интерфейса Revit; 3. Разработка надстройки для Revit с применением Revit API и расширяемого хранилища Extensible Storage; 4. Применение инвестиционного контроля строительства на основе BIM-модели на реальном проекте жилого комплекса. В работе описана методика инвестиционного контроля строительства на основе трёхмерной параметрической модели здания с использованием защищенных параметров. Применение расширяемого хранилища или Extensible storage как способ программного хранения произвольных вспомогательных данных в документе для защиты данных в надстройке Revit позволило управлять доступом к параметрам элементов, защитить конфиденциальную информацию от определенного круга лиц и уменьшить вероятность ошибки при работе с параметром. Внешнее хранилище данных было применено как инструмент хранения стоимостей элементов для их последующего использования в ведомости объемов работ. Работоспособность методики продемонстрирована на примере жилого комплекса «Биография». В заключение отмечены ключевые преимущества методики в сравнении с классическими методами инвестиционного контроля и хранения данных в информационной модели.

This work is devoted to increasing the level of control over investments in construction, as well as the quality of control using Extensible storage (Revit API). The tasks that were solved in the course of the study: 1. Analysis of scientific, technical and regulatory literature on this topic; 2. Development of methods for managing investments in construction, as well as their control using the Revit interface; 3. Development of an add-on for Revit using the Revit API and Extensible Storage; 4. Application of investment control of construction based on a BIM model on a real project of a residential complex. The paper describes a methodology for investment control of construction based on a three-dimensional parametric model of a building using protected parameters. The use of extensible storage or Extensible storage as a way to programmatically store arbitrary auxiliary data in a document to protect data in the Revit add-in made it possible to control access to element parameters, protect confidential information from a certain circle of people and reduce the likelihood of errors when working with a parameter. External data storage was used as a tool for storing item values for their subsequent use in the bill of quantities. The efficiency of the method is demonstrated by the example of the residential complex "Biography". In conclusion, the key advantages of the method are noted in comparison with the classical methods of investment control and data storage in the information model.

Document access rights

Network User group Action
ILC SPbPU Local Network All Read
Internet Authorized users SPbPU Read
-> Internet Anonymous

Table of Contents

  • WhatsApp Image 2021-05-29 at 13.01.14
  • задание (1)
  • Реферат (1)
  • Нормоконтроль
    • ВВЕДЕНИЕ
    • ГЛАВА 1. АНАЛИЗ ТЕКУЩЕГО СОСТОЯНИЯ ТЕХНОЛОГИИ ИНВЕСТИЦИОННОГО КОНТРОЛЯ С ИСПОЛЬЗОВАНИЕМ ИНФОРМАЦИОННОГО МОДЕЛИРОВАНИЯ И ЗАЩИТЫ ДАННЫХ
    • 1.1 Процесс инвестирования в строительные проекты
    • 1.2 Информационное моделирование в строительстве
    • 1.3 Общие обязательные требования к информационной модели
    • 1.4 Эволюция способов хранения информации
    • 1.4.1 Forge Design Automation API
    • 1.4.2 Extensible storage
    • 1.5 Анализ текущего состояния программных комплексов для оценки стоимости строительства, управления закупками и ведения норм времени и расценок
    • 1.6 Методика работы с проектными данными через различные информационные среды
    • 1.7 Инвестиционный контроль строительства
    • ГЛАВА 2. ПРИМЕНЕНИЕ EXTENSIBLE STORAGE ДЛЯ ЗАЩИТЫ ДАННЫХ В НАДСТРОЙКЕ REVIT
    • 2.1 Предпосылки для создания внешнего хранилища с использованием Revit API
    • 2.2 Основы Estorage
    • 2.3 Надстройка «MyCostParametr»
    • 2.3.1 Описание создания надстройки Revit и принцип ее работы
    • ГЛАВА 3. ПРИМЕНЕНИЕ МЕТОДИКИ ИНВЕСТИЦИОННОГО КОНТРОЛЯ СТРОИТЕЛЬСТВА НА ЖИЛОМ КОМПЛЕКСЕ «БИОГРАФИЯ»
    • 3.1 Проверка модели на соответствие стандарту
    • 3.2 Проверка работоспособности плагина
    • 3.3 Формирование списка немоделируемых работ
    • 3.4 Получение ведомости объемов работ
    • 3.5 Выгрузка ВОР и загрузка в BIM-модель единичных расценок и плановых дат
    • 3.6 Ежемесячный цикл ИКС и завершение строительства
    • 3.7 Система производственного документооборота
    • 3.8 Расчет стоимости реализации методики
    • ЗАКЛЮЧЕНИЕ
    • СПИСОК ИСПОЛЬЗОВАННЫХ ИСТОЧНИКОВ
    • Приложение 1
    • Чек-лист проверки модели на соответствие BIM-стандарту компании
    • Приложение 2
    • Формирование списка немоделируемых работ
  • приложение 3
    • Приложение 3
    • Отчёт по проведенному инвест-контролю

Usage statistics

stat Access count: 70
Last 30 days: 0
Detailed usage statistics