Title: Высотное здание бизнес-центра с системами внешнего армирования полимерно-композитными материалами: выпускная квалификационная работа бакалавра: направление 08.03.01 «Строительство» ; образовательная программа 08.03.01_06 «Промышленное и гражданское строительство уникальных зданий и сооружений»
Creators: Парамонов Дмитрий Юрьевич
Scientific adviser: Усанова Ксения Юрьевна
Organization: Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт
Imprint: Санкт-Петербург, 2024
Collection: Выпускные квалификационные работы; Общая коллекция
Subjects: бизнес-центр; высотное здание; полимерно-композитные материалы; система внешнего армирования; business center; high-rise building; fiber reinforced polymer; externally bonded reinforcement
Document type: Bachelor graduation qualification work
File type: PDF
Language: Russian
Level of education: Bachelor
Speciality code (FGOS): 08.03.01
Speciality group (FGOS): 080000 - Техника и технологии строительства
DOI: 10.18720/SPBPU/3/2024/vr/vr24-2973
Rights: Доступ по паролю из сети Интернет (чтение, печать, копирование)
Additionally: New arrival
Record key: ru\spstu\vkr\29386

Allowed Actions:

Action 'Read' will be available if you login or access site from another network Action 'Download' will be available if you login or access site from another network

Group: Anonymous

Network: Internet

Annotation

В работе представлена проектная документация на строительство 25-этажного здания бизнес-центра высотой 110,1 м с подземной автостоянкой, расположенного по адресу г. Санкт-Петербург, пр-т Большевиков, участок 3, кадастровый номер участка: 78:12:0006305:17 в соответствии с заданием на проектирование. Целью исследовательской части проекта является подбор системы внешнего армирования, с последующей оценкой возможности его применения в высотном здании. Для достижения поставленной цели были поставлены следующие задачи: 1. Анализ существующих полимерно-композитных материалов (ПКМ) и их свойств; 2. Экспериментальные исследования прочности на сжатие бетонных образцов с различными системами внешнего армирования; 3. Экспериментальные исследования прочности на растяжение и модуля упругости ламелей из композитов, использованных в системе внешнего армирования. В ходе работы были определены состав и расход материалов в зависимости от принятого класса бетона для производства бетонных образцов-балок, изготовлены и испытаны на прочность бетонные образцы с разными синтетическими и органическими композитными материалами, а также их комбинации. Дополнительно были проведены испытания на прочность композитных пластиков, использованных во внешнем обертывании бетонных образцов.  В заключении, был произведен сравнительный анализ полученных результатов и определен наилучший материал.

The project documentation is developed for the construction of 25-story high-rise business center building with a high of 110.1 m and an underground carpark at St. Petersburg, Bolshevik Ave., uch. 3, account number: 78:12:0006305:17 in accordance with the design assignment. The purpose of the research part is to select an external reinforcement system, followed by an assessment of the possibility of its use in a high-rise building. To complete these purposes, the following tasks were set: 1. Analysis of existing polymer composite materials (PCM) and their properties; 2. Experimental studies of the compressive strength of concrete samples with various external reinforcement systems; 3. Experimental studies of the tensile strength and modulus of elasticity of lamellas made of composites used in the external reinforcement system. During the work, the composition and consumption of materials were determined based on the accepted class of concrete to produce concrete samples, beams, and concrete samples with various synthetic and organic composite materials as well as their combinations were manufactured and tested for strength. In addition, strength tests were conducted on composite plastics used in the external wrapping of concrete samples. Finally, a comparative analysis of the test results was carried out to determine the best material.

Document access rights

Network User group Action
ILC SPbPU Local Network All Read Print Download
Internet Authorized users SPbPU Read Print Download
-> Internet Anonymous

Table of Contents

  • aec17858f7e0e1bf5ccdd811cd74381e08ad72cdd0a35438d5d12981675780fb.pdf
  • aec17858f7e0e1bf5ccdd811cd74381e08ad72cdd0a35438d5d12981675780fb.pdf
    • Листы
      • 1 - Ведомость рабочих чертежей основного комплекта к разделу 1
    • Листы
      • 2 - Схема планировочной организации земельного участка
    • Листы
      • 1 - Ведомость рабочих чертежей основного комплекта к разделу 2
    • Листы
      • 2 - План подземной автостоянки на отм. -4,200
    • Листы
      • 3 - План 1 этажа на отм. 0,000
    • Листы
      • 4 - План типового этажа
    • Листы
      • 5 - Фасад 1-6
    • Листы
      • 6 - Фасад 6-1
    • Листы
      • 7 - Фасад А-Ж
    • Листы
      • 8 - Фасад Ж-А
    • Листы
      • 9 - Разрез 1-1
    • Листы
      • 1 - Ведомость рабочих чертежей основного комплекта к разделу 3
    • Листы
      • 2 - Схема расположения свайного поля, схема расположения арматуры в свае СН-800-30, геологический разрез
    • Листы
      • 3 - Схема армирования стены СМ-1, схема армирования колонны К-1
    • Листы
      • 4 - Схема армирования плиты перекрытия типового этажа ТМП-1, схема армирования балки БМ-1
    • Листы и виды
      • Ведомость рабочих чертежей к разделу 5
    • Листы и виды
      • Стройгенплан
    • Листы
      • 1 - Ведомость рабочих чертежей основного комплекта к разделу 6
    • Листы
      • 2 - Ситуационный план земельного участка
    • Листы
      • 3 - Схема эвакуации подземного этажа на отм. -8.400
    • Листы
      • 4 - Схема эвакуации типового этажа
  • aec17858f7e0e1bf5ccdd811cd74381e08ad72cdd0a35438d5d12981675780fb.pdf
    • Листы и виды
      • Календарный план строительства
    • Листы и виды
      • График потребности в ресурсах
    • Листы и виды
      • Лист2
    • Листы и виды
      • Лист1