Details
Title | Разработка схемы электроснабжения энергорайона Ленинградской области: выпускная квалификационная работа магистра: направление 13.04.02 «Электроэнергетика и электротехника» ; образовательная программа 13.04.02_01 «Электроэнергетические установки электрических станций и подстанций» |
---|---|
Creators | Мясникова Светлана Николаевна |
Scientific adviser | Шахова Мария Алексеевна |
Organization | Санкт-Петербургский политехнический университет Петра Великого. Институт энергетики |
Imprint | Санкт-Петербург, 2024 |
Collection | Выпускные квалификационные работы ; Общая коллекция |
Subjects | Релейная защита ; Токи короткого замыкания ; Электрические подстанции ; выбор оборудования ; selection of power equipment |
UDC | 621.316.925 ; 621.311.4 |
Document type | Master graduation qualification work |
File type | |
Language | Russian |
Level of education | Master |
Speciality code (FGOS) | 13.04.02 |
Speciality group (FGOS) | 130000 - Электро- и теплоэнергетика |
DOI | 10.18720/SPBPU/3/2024/vr/vr24-3842 |
Rights | Доступ по паролю из сети Интернет (чтение, печать, копирование) |
Record key | ru\spstu\vkr\32336 |
Record create date | 8/28/2024 |
Allowed Actions
–
Action 'Read' will be available if you login or access site from another network
Action 'Download' will be available if you login or access site from another network
Group | Anonymous |
---|---|
Network | Internet |
Целью данной работы является проектирование электрической части подстанции 110/10 кВ для электроснабжения энергорайона. Задачи, которые решались в ходе выполнения работы: 1. Выбор компоновки и главной схемы электрических соединений подстанции, а также основного оборудования. 2. Расчет токов короткого замыкания и выбор ячеек КРУ, выключателей, разъединителей; выбор шин и токоведущих частей, измерительных трансформаторов тока и напряжения. 3. Проектирование фрагмента сети энергорайона. Выбор главной схемы и оборудования трансформаторной подстанции. 4. Разработка структуры АСУ ТП, в том числе РЗА, АИИС КУЭ и АСДУ, выбор многофункциональных измерительных приборов и устройств РЗА, разработка структуры АСДУ. В работе рассчитаны токи короткого замыкания и выбрано основное и вторичное оборудование на подстанции и трансформаторной подстанции. Разработана структура АСУ ТП, в том числе схема АСДУ с передачей данных в ИВК ЦСОД и АРМ. Выбраны терминалы РЗА, счетчики, измерительные преобразователи, контроллеры, устройства сбора и передачи данных. Рассмотрено применение стандарта МЭК 60870 и разработаны структурные схемы передачи данных. Результатом проделанной работы является проект строительства подстанции 110/10 кВ и трансформаторной подстанции 10/0,4 кВ с элементами цифровой подстанции.
The purpose of this work is to design the electrical part of a 110/10 kV substation for power supply to the energy district. The tasks that were solved during the implementation of the work: – Selection of the layout and the main electrical connection scheme of the substation, as well as the main equipment. – Calculation of short-circuit currents and selection of switchgear cells, circuit breakers, disconnectors; selection of busbars and current-carrying parts, current and voltage transformers. – Design of a fragment of the energy district network. Selection of the main scheme and equipment of the transformer substation. – Development of the structure of the ACS TP, including RPA, automated information and measurement system and ACS TP, selection of multifunctional measuring instruments and RPA devices, development of the structure of the ACS TP. The work calculated the short-circuit currents and selected the main and secondary equipment for the substation. The structure of the ACS TP, including the scheme of the automated system for process control with data transfer to the central supervisory and data acquisition system, has been developed. RPA terminals, measuring transducers, controllers, and data collection and transmission devices have been selected. The application of the IEC 60870 standard has been considered and structural data transmission schemes have been developed. The result of the work is a project for the construction of a 110/10 kV substation and a 10/0.4 kV transformer substation with elements of a digital substation.
Network | User group | Action |
---|---|---|
ILC SPbPU Local Network | All |
|
Internet | Authorized users SPbPU |
|
Internet | Anonymous |
|
- ПЕРЕЧЕНЬ ПРИНЯТЫХ СОКРАЩЕНИЙ
- ВВЕДЕНИЕ
- 1. ВЫБОР ОСНОВНОГО ОБОРУДОВАНИЯ И ГЛАВНОЙ СХЕМЫ ЭЛЕКТРИЧЕСКИХ СОЕДИНЕНИЙ ПС-110/10
- 1.1 Выбор главной схемы электрических соединений ПС-110/10
- 1.2 Выбор понижающих трансформаторов ПС-110/10
- 1.
- 2. РАСЧЕТ ТОКОВ КОРОТКОГО ЗАМЫКАНИЯ
- 2.
- 2.1 Расчет тока короткого замыкания в характерных точках системы
- 3. ВЫБОР КОММУТАЦИОННЫХ АППАРАТОВ, ШИН, КАБЕЛЕЙ, ТОКОПРОВОДОВ, ГИБКИХ ПРОВОДОВ ПС-110/10
- 1.
- 2.
- 3.
- 3.1. Выбор высоковольтных выключателей и разъединителей
- 3.1.1. Выбор выключателей и разъединителей РУ 110 кВ
- 3.1.2. Выбор выключателей на вводе РУ 10 кВ и секционного выключателя
- 3.1.3. Выбор КРУ и оборудования на отходящих фидерах РУ-10 кВ
- 3.2. Выбор шин и токоведущих частей
- 3.2.1. Выбор сборных шин и опорных изоляторов 110 кВ
- 3.2.2. Выбор сборных шин и опорных изоляторов 10 кВ
- 3.2.3. Выбор токопроводов от трансформатора до КРУ 10 кВ
- 3.2.4. Выбор кабелей отходящих фидеров 10 кВ
- 4. РАСЧЕТ ФРАГМЕНТА СЕТИ 10 кВ
- 4.1. Проектирование однолинейной схемы
- 4.2. Выбор основного оборудования ТП-10/0,4
- 5. ПРОЕКТИРОВАНИЕ АСУ ТП
- 5.1. Общие положения
- 5.2. Разработка структуры АИИС КУЭ
- 5.2.1. АИИС КУЭ на ПС-110/10
- 5.2.2. АИИС КУЭ в ТП-10/0,4
- 5.3. Разработка структуры РЗА
- 5.3.1. РЗА на ПС-110/10 со стороны ВН 110 кВ
- 5.3.2. РЗА на ПС-110/10 КРУ 10 кВ
- 5.3.3. РЗА на ТП-10/0,4
- 5.4. Разработка структуры АСДУ
- 5.4.1. Структура АСДУ на ПС-110/10
- 5.4.2. Структура АСДУ в ТП-10/0,4 кВ
- ЗАКЛЮЧЕНИЕ
- СПИСОК ЛИТЕРАТУРЫ
Access count: 10
Last 30 days: 0