Details
Title | Integrating 5D BIM into construction projects in Ethiopia: выпускная квалификационная работа магистра: направление 08.04.01 «Строительство» ; образовательная программа 08.04.01_12 «Гражданское строительство (международная образовательная программа) / Civil Engineering (International Educational Program)» |
---|---|
Creators | Ибрахим Муштефа Омер |
Scientific adviser | Брайла Наталья Васильевна |
Organization | Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт |
Imprint | Санкт-Петербург, 2024 |
Collection | Выпускные квалификационные работы; Общая коллекция |
Subjects | building information modelling; project management; project scheduling; project optimization; cost control; cost overrun; cost management; time management; adaptive resource allocation |
Document type | Master graduation qualification work |
File type | |
Language | Russian |
Level of education | Master |
Speciality code (FGOS) | 08.04.01 |
Speciality group (FGOS) | 080000 - Техника и технологии строительства |
DOI | 10.18720/SPBPU/3/2024/vr/vr24-6513 |
Rights | Доступ по паролю из сети Интернет (чтение) |
Additionally | New arrival |
Record key | ru\spstu\vkr\33130 |
Record create date | 8/29/2024 |
Allowed Actions
–
Action 'Read' will be available if you login or access site from another network
Group | Anonymous |
---|---|
Network | Internet |
This thesis explores how integrating 5D BIM technology affects construction projects in Ethiopia. 5D BIM technology, which stands for Building Information Modeling, is widely used in different countries achieving more project efficiency, minimized construction rework, enhanced team collaboration and so on. Although the success of BIM technology is proven in many nations, its application is poorly adopted in Ethiopia. The findings of this thesis demonstrate opportunities in advancing the already booming sector in Ethiopia by enhancing project delivery and cost control. These two points continue to be a challenge for many construction projects across the country, even today. This thesis combines several research methods, including a literature review, a detailed survey, and a case study. The literature review explores the characteristics of Ethiopias construction industry, the overall construction project management methods used, challenges and opportunities too. 5D BIM applications are discussed in extensive manner, how it can be optimized and their outcomes. To deeply understand the construction industry, a survey consisting of 120 participants was conducted. A diverse group of professionals, each bringing their unique experiences and expertise, participated in a survey styled like a questionnaire. This survey delved into numerous aspects of Building Information Modeling (BIM), aiming to thoroughly understand the dynamics of the construction industry within the country. Following the survey, a thesis-based case study is made. I created an Adaptive Resource Allocation Framework (ARAF) to be implemented within the BIM technology for risk identification and mitigation. Risk scenarios are created and examined how they can affect the construction project process, the mitigation action would be ready and minimize impact the project timeline and budget, even avoid it completely if possible. The results of the case study revealed that integrating 5D BIM technologies in the construction projects with the adaptive resource allocation system can be used for risk management, resource monitoring and prediction, decision making and optimization, and adaptation mechanisms.
Network | User group | Action |
---|---|---|
ILC SPbPU Local Network | All |
|
Internet | Authorized users SPbPU |
|
Internet | Anonymous |
|
Access count: 0
Last 30 days: 0