Details
Title | Модернизация паросилового блока мощностью 300 МВт Азербайджанской ГРЭС на базе парогазовой технологии: выпускная квалификационная работа магистра: направление 13.04.01 «Теплоэнергетика и теплотехника» ; образовательная программа 13.04.01_03 «Инжиниринг теплоэнергетических систем» |
---|---|
Creators | Печёнкин Анатолий Игоревич |
Scientific adviser | Аникина Ирина Дмитриевна |
Organization | Санкт-Петербургский политехнический университет Петра Великого. Институт энергетики |
Imprint | Санкт-Петербург, 2025 |
Collection | Выпускные квалификационные работы ; Общая коллекция |
Subjects | модернизация ; газотурбинная установка ; турбопривод ; режим работы ; тепловой баланс ; проверка адекватности ; газоснабжение ; modernization ; gas turbine unit ; turbo drive ; operating mode ; heat balance ; validation ; gas supply |
Document type | Master graduation qualification work |
File type | |
Language | Russian |
Level of education | Master |
Speciality code (FGOS) | 13.04.01 |
Speciality group (FGOS) | 130000 - Электро- и теплоэнергетика |
DOI | 10.18720/SPBPU/3/2025/vr/vr25-5085 |
Rights | Доступ по паролю из сети Интернет (чтение, печать, копирование) |
Additionally | New arrival |
Record key | ru\spstu\vkr\39216 |
Record create date | 9/24/2025 |
Allowed Actions
–
Action 'Read' will be available if you login or access site from another network
Action 'Download' will be available if you login or access site from another network
Group | Anonymous |
---|---|
Network | Internet |
Данная работа посвящена анализу технических решений, выполненных в рамках модернизации паросилового блока на базе газотурбинных установок (ГТУ) с утилизацией тепла и использованием инновационного решения в системе газоснабжения, основанного на существующем турбоприводе, входящем в состав модернизируемой паротурбинной установки (ПТУ). Работа выполнена на базе и во время реализации парогазовой установки, что позволило детально описать все принимаемые технические решения, а также выполнить теоретические расчёты вручную и с использованием САПР, и сопоставить их с показателями, полученными на стадии опытной эксплуатации парогазового цикла (ПГУ). При сборе данных с работающего энергоблока проанализирована эффективность наладки установленного оборудования на разных режимах работы, выданы рекомендации. В результате были сделаны выводы по эффективности принятых решений и адекватности разработанной модели ПГУ, а также проведён анализ работы ПГУ и сравнение с проектными решениями с учётом теплового баланса. Особое внимание уделено проверке адекватности моделей и методик расчёта, влиянию параметров газоснабжения на надёжность и эффективность работы оборудования, а также оптимизации теплового баланса с учётом условий эксплуатации и режимов работы.
This work is dedicated to the analysis of technical solutions implemented within the framework of modernizing the steam power unit based on gas turbine units (GTU) with heat recovery and the use of an innovative solution in the gas supply system, relying on the existing turbo drive, which is part of the modernized steam turbine unit (STU). The study was conducted during the design and implementation phases of the combined cycle power plant (CCPP), allowing detailed description of all adopted technical solutions, as well as manual and CAD-based theoretical calculations, which were compared with the data obtained during the pilot operation phase of the combined cycle unit (CCU). Data collected from the operating power unit were analyzed to assess the effectiveness of the installed equipment adjustments under various operating modes, and recommendations were provided. As a result, conclusions were made regarding the effectiveness of the adopted solutions and the adequacy of the developed CCU model, including an analysis of the CCU operation compared with the design parameters considering the heat balance. Special attention was paid to the validation of models and calculation methods, the influence of gas supply parameters on the reliability and efficiency of equipment operation, as well as the optimization of the heat balance taking into account the operating conditions and modes.
Network | User group | Action |
---|---|---|
ILC SPbPU Local Network | All |
|
Internet | Authorized users SPbPU |
|
Internet | Anonymous |
|
- ОБОЗНАЧЕНИЯ И СОКРАЩЕНИЯ
- ВВЕДЕНИЕ
- ГЛАВА 1 ОСНОВНЫЕ ХАРАКТЕРИСТИКИ ВНОВЬ ВОЗВОДИМОЙ ПГУ АЗЕРБАЙДЖАНСКОЙ ГРЭС
- 1.1 Анализ технической документации на газовую турбину AE94.3A. Описание параметров конструкции и основных схем использования ГТУ Ansaldo AE94.3A
- 1.2 Анализ технической документации на трехконтурный котел-утилизатор производства Dongfang electric
- 1.3 Анализ технической документации на паротурбинную установку К-300-240-3
- 1.4 Анализ существующих решений по модернизации паросилового блока
- ГЛАВА 2 ПРИНЦИПИАЛЬНЫЕ ТЕХНИЧЕСКИЕ РЕШЕНИЯ ВНОВЬ ВОЗВОДИМОЙ ПГУ АЗЕРБАЙДЖАНСКОЙ ГРЭС
- 2.1 Компоновочные решения основного и вспомогательного оборудования. Схема генплана
- 2.2 Оценка преимуществ предложенных решений для модернизации блока
- 2.3 Описание тепловой схемы модернизированного парогазового дубль-блока её компонентов и их взаимодействия
- ГЛАВА 3 РАСЧЕТ ПОКАЗАТЕЛЕЙ КОНДЕНСАЦИОННОЙ КОМБИНИРОВАННОЙ УСТАНОВКИ С ТРЕМЯ УРОВНЯМИ ДАВЛЕНИЯ ПАРА
- 3.1 Расчет теплоэнергетических характеристик установки
- 3.2 Валидация, проверка адекватности расчета при помощи расчетной программы THERMOFLEX
- 3.3 Оценка полученных результатов
- ГЛАВА 4 ОПТИМИЗАЦИЯ СИСТЕМЫ ГАЗОСНАБЖЕНИЯ ПГУ АЗЕРБАЙДЖАНСКОЙ ГРЭС
- 4.1 Рассмотрение использования существующей турбоустановки ОР-12ПМ для привода дожимного компрессора природного газа.
- 4.2 Расчет показателей с учетом предложенной оптимизации.
- 4.3 Оценка эффективности новой конфигурации системы газоснабжения.
- ГЛАВА 5 ОПЫТНАЯ ЭКСПЛУАТАЦИЯ И АНАЛИЗ ЭФФЕКТИВНОСТИ ПРИНЯТЫХ РЕШЕНИЙ
- 5.1 Сбор информации с видеокадров действующей системы АСУ ТП
- 5.2 Анализ собранной информации, проверка адекватности модели
- ЗАКЛЮЧЕНИЕ
- СПИСОК ИСПОЛЬЗОВАННЫХ ИСТОЧНИКОВ
- ПРИЛОЖЕНИЕ А
- ПРИЛОЖЕНИЕ Б
- ПРИЛОЖЕНИЕ В
- ПРИЛОЖЕНИЕ Г
- ПРИЛОЖЕНИЕ Д
- ПРИЛОЖЕНИЕ Е
- Приложение
- Листы и виды
- Модель
- Листы и виды
Access count: 0
Last 30 days: 0