Details
| Title | Высотное здание бизнес-центра с подземным паркингом глубиной 15,6 м: выпускная квалификационная работа специалиста: направление 08.05.01 «Строительство уникальных зданий и сооружений» ; образовательная программа 08.05.01_01 «Строительство высотных и большепролетных зданий и сооружений» |
|---|---|
| Creators | Алонзова Елена Евгеньевна |
| Scientific adviser | Стрелец Ксения Игоревна |
| Organization | Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт |
| Imprint | Санкт-Петербург, 2025 |
| Collection | Выпускные квалификационные работы ; Общая коллекция |
| Subjects | технология строительства ; высотное строительство ; подземное строительство ; нулевой цикл ; top-down ; semi top-down ; сроки строительства ; construction technology ; high-rise construction ; underground construction ; zero cycle ; construction duration |
| Document type | Specialist graduation qualification work |
| File type | |
| Language | Russian |
| Level of education | Specialist |
| Speciality code (FGOS) | 08.05.01 |
| Speciality group (FGOS) | 080000 - Техника и технологии строительства |
| DOI | 10.18720/SPBPU/3/2025/vr/vr25-5254 |
| Rights | Доступ по паролю из сети Интернет (чтение) |
| Additionally | New arrival |
| Record key | ru\spstu\vkr\39419 |
| Record create date | 11/6/2025 |
Allowed Actions
–
Action 'Read' will be available if you login or access site from another network
| Group | Anonymous |
|---|---|
| Network | Internet |
Целью выпускной квалификационной работы является разработка разделов проектной документации на строительство высотного здания бизнес-центра с подземным паркингом глубиной 15,6 м. Разделы разрабатываются согласно заданию на выполнение ВКР и в соответствии с требованиями действующей нормативной документации. Целью исследовательской части является оценка эффективности технологии возведения многоуровневого подземного паркинга высотного здания. Задачи, которые были решены в процессе разработки ВКР: 1. Проведение критического анализа литературных источников, содержащих исследования технологий «Top-Down» и «Semi Top-Down», как с точки зрения трудозатрат по отношению к классическому методу, так и с точки зрения особенностей реализации данных методов; 2. Выполнение расчета трудозатрат на производство работ по устройству подземной части здания с применением методов открытого котлована, «Semi Top-Down» и «Top-Down» с учетом особенностей каждой технологии; 3. Разработка календарных графиков на каждый метод строительства; 4. Оценка эффективности технологий возведения подземной части и выбор оптимального метода возведения подземной части высотного здания. Исследовательская часть посвящена анализу влияния технологий возведения подземных частей зданий «Semi Top-Down» и «Top-Down» на общую продолжительность строительства. В рамках разработки раздела был проведен сравнительных анализ трудозатрат и сроков строительства для трех методов возведения проектируемого объекта. В результате исследования было выявлено, что за счет внедрения в проект технологий «Top-Down» и «Semi Top-Down» общие сроки строительства сокращаются, однако реализация данных методов связана с различными технологическими сложностями и большими трудозатратами по сравнению с классическим методом. Эффективность рассматриваемых технологий доказана, однако рациональность их использования зависит от качества принятых проектных решений. Для решения поставленных задач использовались следующие программные комплексы: Autodesk Revit 2022, Autodesk AutoCAD 2022, ПК ЛИРА-САПР 2022, SOFiSTiK 2022, SYNCHRO 4D Pro 2021, MS Word, MS Excel, Сигма ПБ, MS Project, SmetaWIZARD 5, Twinmotion 2023.
The objective of the thesis is to develop sections of project documentation for the construction of a high-rise business center with an underground parking 15.6 m deep. The sections are developed in accordance with the thesis assignment and current regulatory requirements. The research part aims to evaluate the efficiency of construction technologies for a multi-level underground parking facility in a high-rise building. Tasks that were solved during the development of the graduate qualification work: 1. Conducting a critical analysis of literary sources containing research on Top-Down and Semi Top-Down technologies, both in terms of labor costs compared to the classical method and in terms of the implementation features of these methods; 2. Calculation of labor costs for underground construction using open-cut, Semi Top-Down and Top-Down methods, considering the specifics of each technology; 3. Development of construction schedules for each method; 4. Evaluation of the effectiveness of underground construction technologies and selection of the optimal method for the high-rise building. The research section focuses on analyzing the impact of Semi Top-Down and Top-Down construction technologies on the overall project duration. A comparative analysis of labor costs and construction timelines was conducted for the three methods. The research results revealed that due to calculations, the Top-Down and Semi Top-Down technologies introduced into the project are reducing the overall construction time, but the implementation of these methods involves various technological difficulties and higher labor costs compared to the classical method. The effectiveness of the technologies under consideration has been proven, but the rationality of their execution depends on the quality of the design solutions. To solve these tasks, the following software packages were implemented: Autodesk Revit 2022, Autodesk AutoCAD 2022, LIRA-SAPR 2022, SOFiSTiK 2022, SYNCHRO 4D Pro 2021, MS Word, MS Excel, Sigma PB, MS Project, SmetaWIZARD 5, Twinmotion 2023.
| Network | User group | Action |
|---|---|---|
| ILC SPbPU Local Network | All |
|
| Internet | Authorized users SPbPU |
|
| Internet | Anonymous |
|
- ПЗУ
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- СПОЗУ
- Листы
- 01 - Схема планировочной организации земельного участка
- Листы
- Листы
- АР
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - План подземного этажа на отм. -3.750
- Листы
- Лист
- Листы
- 02 - План 1-го этажа на отм. 0.000
- Листы
- Лист
- Листы
- 03 - План типового этажа на отм. +16.800
- Листы
- Лист
- Листы
- 04 - План кровли
- Листы
- Лист
- Листы
- 05 - Разрез 1-1. Типовые узлы
- Листы
- Лист
- Листы
- 06 - Фасад Ж.1 - А
- Листы
- Лист
- Листы
- 07 - Фасад А-Ж.1
- Листы
- Лист
- Листы
- 08 - Визуализация архитектурных решений
- Листы
- Листы
- КР
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Схема расположения свайного поля. Схема армирования сваи
- Листы
- Лист
- Листы
- 02 - Схема расположения несущих конструкций -5 этажа. Схема расположения верхней арматуры фундаментной плиты
- Листы
- Лист
- Листы
- 03 - Схема расположения нижней арматуры фундаментной плиты. Схема армирования колонны
- Листы
- Лист
- Листы
- 04 - Схема армирования плиты перекрытия. Схема армирования балки
- Листы
- Лист
- Листы
- 05 - Схема армирования плиты перекрытия. Схема армирования стены
- Листы
- Листы
- ИОС
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Схема принципиальная ГРЩ
- Листы
- Лист
- Листы
- 02 - Схема принципиальная ВРУ1.1
- Листы
- Лист
- Листы
- 03 - Схема принципиальная однолинейная ЩР5, ЩО5
- Листы
- Лист
- Листы
- 04 - Схема принципиальная однолинейная ЩАО5
- Листы
- Лист
- Листы
- 05 - Схема принципиальная однолинейная ЩМ5.1, ЩМ5.2
- Листы
- Лист
- Листы
- 06 - Схема принципиальная однолинейная ЩМ5.3, ЩМ5.4
- Листы
- Лист
- Листы
- 07 - Схема принципиальная однолинейная ЩМ5.5, ЩМ5.6
- Листы
- Лист
- Листы
- 08 - План электроосвещения и силового оборудования на отм. -3.600
- Листы
- Лист
- Листы
- 09 - План розеточной сети первого этажа на отм. 0.000
- Листы
- Лист
- Листы
- 10 - План расположения сетей освещения первого этажа на отм. 0.000
- Листы
- Лист
- Листы
- 11 - План розеточной сети типового этажа на отм. +16.800
- Листы
- Лист
- Листы
- 12 - План расположения сетей освещения типового этажа на отм. +16.800
- Листы
- Лист
- Листы
- 13 - Схема молниезащиты
- Листы
- Лист
- Листы
- 14 - Спецификация осветительных приборов и оборудования
- Листы
- Листы
- ТСП
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Схема производства работ
- Листы
- Листы
- ПОС
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Строительный генеральный план
- Листы
- Лист
- Листы
- 02 - Календарный план
- Листы
- Лист
- Листы
- 03 - График ресурсов
- Листы
- Листы
- ПБ
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Схема эвакуации с подземного этажа на отм. -3.600
- Листы
- Лист
- Листы
- 02 - Схема эвакуации с типового этажа на отм. +16.800
- Листы
- Листы
- ИЧ
- Листы
- 1 - Ведомость рабочих чертежей основного комплекта
- Лист
- Листы
- 01 - Календарный график для технологии "Top-Down"
- Листы
- Лист
- Листы
- 02 - Календарный график для метода открытого котлована
- Листы
- Листы