Title Comprehensive Performance Optimization of the Bazian Power Plant in the Kurdistan Region of Iraq: выпускная квалификационная работа магистра: направление 13.04.01 «Теплоэнергетика и теплотехника» ; образовательная программа 13.04.01_03 «Тепловые электрические станции (международная образовательная программа) / Power Plant Engineering (International Educational Program)»
Creators Мухтар Шабаз Нахро Гхази
Scientific adviser Басати Панах Мехди
Organization Санкт-Петербургский политехнический университет Петра Великого. Институт энергетики
Imprint Санкт-Петербург, 2025
Collection Выпускные квалификационные работы ; Общая коллекция
Subjects efficiency improvement methods ; gas turbines ; combined cycle implementation ; regeneration techniques ; inlet air cooling systems ; thermodynamic analysis ; GE Frame 9E ; Bazian Power Plant ; Kurdistan Region ; Iraq ; evaporative cooling ; phased implementation strategy ; power plant optimization
Document type Master graduation qualification work
Language Russian
Level of education Master
Speciality code (FGOS) 13.04.01
Speciality group (FGOS) 130000 - Электро- и теплоэнергетика
DOI 10.18720/SPBPU/3/2025/vr/vr26-350
Rights Доступ по паролю из сети Интернет (чтение, печать, копирование)
Additionally New arrival
Record key ru\spstu\vkr\39870
Record create date 2/24/2026

Allowed Actions

Action 'Read' will be available if you login or access site from another network

Action 'Download' will be available if you login or access site from another network

Group Anonymous
Network Internet

This thesis gives a full look at how to make the GE Frame 9E gas turbines at the Bazian Power Plant in the Kurdistan Region of Iraq more efficient.  The study looks into three main ways to optimize: using a combined cycle, regeneration methods, and cooling devices for the air that comes in.  This study compares various methods in a systematic way by looking at their thermodynamic properties, technical feasibility, and economic viability. It then comes up with an integrated optimization strategy that fits the unique needs of the Bazian facility. The study shows that using a combined cycle can boost efficiency the greatest. It could raise the overall plants efficiency from 34–37% to 52–56% and add 280–320 MW of capacity without needing more fuel.  But this method needs a lot of money ($200–300 million) and a lot of changes to the current plant.  Regeneration improves efficiency by 5 to 7 percentage points, but it makes it harder to integrate with the existing turbines because it needs less capital.  Inlet air cooling, especially evaporative cooling, is a very cost-effective way to deal with the hot, dry climate in Kurdistan. It can boost power generation by 7–14% in the summer months with only a small investment ($5–10 million for evaporative systems). The thesis suggests a phased implementation strategy based on these results. This would start with evaporative inlet air cooling as a short-term solution (1–2 years), then move on to combined cycle conversion for part of the plant in the medium term (3–5 years), and finally plant-wide optimization in the long term (5+ years).  This method strikes a balance between short-term performance advantages and long-term efficiency gains while keeping capital costs and implementation complexity in check.  The study adds to the field of power plant optimization by giving an organized way to look at and put into action ways to make current gas turbine facilities more efficient. This is especially useful for plants that are located in hot, dry areas where electricity demand is rising.

Network User group Action
ILC SPbPU Local Network All
Read Print Download
Internet Authorized users SPbPU
Read Print Download
Internet Anonymous

Access count: 0 
Last 30 days: 0

Detailed usage statistics