Название An Integrated 4D BIM Framework for Construction Industry in Pakistan: выпускная квалификационная работа магистра: направление 08.04.01 «Строительство» ; образовательная программа 08.04.01_12 «Гражданское строительство (международная образовательная программа) / Civil Engineering (International Educational Program)»
Авторы Ахмед Анас
Научный руководитель Романович Марина Александровна
Организация Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт
Выходные сведения Санкт-Петербург, 2026
Коллекция Выпускные квалификационные работы ; Общая коллекция
Тематика building information modeling (BIM) ; 4D BIM integration ; construction project management ; planning ; schedule integration ; delay analysis ; construction delays ; high-rise construction ; clash detection ; key performance indicators ; BIM adoption barriers ; Pakistan construction industry ; visual simulation ; critical path method ; policy framework ; return on investment ; construction project delivery ; urban construction ; space-constrained sites ; level of development
Тип документа Выпускная квалификационная работа магистра
Язык Русский
Уровень высшего образования Магистратура
Код специальности ФГОС 08.04.01
Группа специальностей ФГОС 080000 - Техника и технологии строительства
DOI 10.18720/SPBPU/3/2026/vr/vr26-5570
Права доступа Доступ по паролю из сети Интернет (чтение, печать, копирование)
Дополнительно Новинка
Ключ записи ru\spstu\vkr\43067
Дата создания записи 26.08.2026

Разрешенные действия

Действие 'Прочитать' будет возможно после подготовки администраторами необходимых файлов

Действие 'Загрузить' будет доступно, если вы выполните вход в систему или будете работать с сайтом на компьютере в другой сети

Группа Анонимные пользователи
Сеть Интернет

This masters dissertation examines the planning, monitoring, and delivery of high-rise construction projects in Pakistan through the development and validation of an integrated 4D BIM methodological framework. The research object is project planning and delivery processes in high-rise construction in Pakistan; the subject is a methodological approach based on BIM-enabled schedule integration, delay analysis, performance indicators, and policy recommendations. The research employs a mixed-methods case study design combining quantitative schedule analysis with descriptive survey analysis of 213 construction professionals. A full parametric BIM model (LOD 300–350) of the Courtyard by Marriott hotel (G+9, Islamabad) was developed in Autodesk Revit, integrated with a 527-activity baseline schedule in Microsoft Project, and linked to Synchro 4D Pro for visual simulation and planned-versus-actual comparison. The case study revealed a total project overrun of 134 calendar days (19.1%), with the raft foundation phase recording overruns of 166–200%. Five KPIs — Productivity Loss Factor, Safety Compliance Rate, BIM Adoption Maturity, Material Supply Reliability, and Resource Availability Index — confirmed systemic planning deficiencies. Survey results identified organizational resistance (69.3%), high software costs (59.9%), and skill shortage (30.2%) as primary adoption barriers. The framework is applicable to construction companies, project managers, and public authorities in Pakistan for improving schedule planning, delay detection, and stakeholder coordination. A three-tier policy framework and five-year roadmap are proposed for national BIM adoption. The findings demonstrate that BIM-enabled 4D schedule integration can reduce cumulative project delay by 55–70% and generate an estimated ROI of 27–45 times the initial investment when implemented from project outset with adequate training and management commitment.