Details
Title | Contemporary strategies and approaches in 3-D information modeling |
---|---|
Other creators | Kumar (Bimal), |
Collection | Электронные книги зарубежных издательств ; Общая коллекция |
Subjects | Building information modeling. ; Three-dimensional display systems. ; Visual analytics. ; ARCHITECTURE / Adaptive Reuse & Renovation ; ARCHITECTURE / Buildings / Landmarks & Monuments ; ARCHITECTURE / Professional Practice ; ARCHITECTURE / Reference ; EBSCO eBooks |
Document type | Other |
File type | |
Language | English |
Rights | Доступ по паролю из сети Интернет (чтение, печать, копирование) |
Record key | on1031706535 |
Record create date | 4/19/2018 |
Allowed Actions
pdf/1793322.pdf | – |
Action 'Read' will be available if you login or access site from another network
Action 'Download' will be available if you login or access site from another network
|
---|---|---|
epub/1793322.epub | – |
Action 'Download' will be available if you login or access site from another network
|
Group | Anonymous |
---|---|
Network | Internet |
"This book focuses on three research domains: building information modeling, 3D GIS, and integration of 3D information in the urban built environment. It facilitates the exchange of current scientific information, as well as sharing of state-of-the art technological developments within the AEC industry"--.
Network | User group | Action |
---|---|---|
ILC SPbPU Local Network | All |
|
Internet | Authorized users SPbPU |
|
Internet | Anonymous |
|
- Title Page
- Copyright Page
- Book Series
- Table of Contents
- Detailed Table of Contents
- Preface
- Chapter 1: BIM and Cultural Heritage
- Chapter 2: Constraints in Authoring BIM Components
- Chapter 3: Topologically Consistent Space, Time, Version, and Scale Using Alexandrov Topologies
- Chapter 4: BIM FM
- Chapter 5: Three-Dimensional Information Retrieval (3DIR)
- Chapter 6: Integration of BIM Work Culture for Improving Global Project Collaboration Productivity
- Chapter 7: Demystifying Collaboration in BIM-Based Projects Under Design-Build Procurement
- Chapter 8: GML-Based nD Data Management With a Big Geo Data Semantic World Modeling Approach
- Chapter 9: Investigating Effects of Psychophysical Metrics on Fidelity in 3D Space Visualization
- Chapter 10: Streamlining a Design, Manufacture, and Fitting Workflow Within a UK Fit-Out SME
- Compilation of References
- About the Contributors
- Index