№ |
Element
|
Documents count |
---|---|---|
201 | construction optimization (>>>) | 1 |
202 | construction schedule (>>>) | 1 |
203 | construction time (>>>) | 1 |
204 | construction works (>>>) | 1 |
205 | constructions (>>>) | 1 |
206 | constructions of facades (>>>) | 1 |
207 | constructions with pre-voltage (>>>) | 1 |
208 | constructivism (>>>) | 1 |
209 | containment building (>>>) | 1 |
210 | continuous concreting (>>>) | 1 |
211 | contitutive model (>>>) | 1 |
212 | control and management (>>>) | 1 |
213 | contruction management (>>>) | 1 |
214 | cooling tower shell (>>>) | 1 |
215 | corrosion resistance (>>>) | 1 |
216 | cost (>>>) | 3 |
217 | cost estimation (>>>) | 1 |
218 | cost evaluation of construction (>>>) | 2 |
219 | cost of materials (>>>) | 1 |
220 | costs (>>>) | 1 |
Facet 'Subjects'
Filter: Level of education:Specialist;Speciality code (FGOS):08.05.01