№ |
Element
|
Documents count |
---|---|---|
721 | the machine (>>>) | 2 |
722 | the method for preparing the workpiece is selected (>>>) | 1 |
723 | the part processing process is developed (>>>) | 1 |
724 | the type of production (>>>) | 1 |
725 | thin-walled sleeve (>>>) | 1 |
726 | thread connection (>>>) | 1 |
727 | three-jaw chuck (>>>) | 1 |
728 | thrower (>>>) | 1 |
729 | time (>>>) | 5 |
730 | time standards (>>>) | 1 |
731 | time allowance (>>>) | 2 |
732 | time limits (>>>) | 2 |
733 | time norm (>>>) | 2 |
734 | time norms (>>>) | 17 |
735 | time norms for operations were calculated and a set of technological documentation was formed (>>>) | 1 |
736 | time processing (>>>) | 1 |
737 | time processings (>>>) | 2 |
738 | time rate (>>>) | 1 |
739 | time rates (>>>) | 17 |
740 | time setting (>>>) | 1 |
Facet 'Subjects'
Filter: Код специальности ФГОС:15.03.05;Тематика:заготовка