№ |
Element
|
Documents count |
---|---|---|
1 | construction tunnel (>>>) | 7 |
2 | derivational water intake (>>>) | 2 |
3 | dirt dam (>>>) | 3 |
4 | diverting channel (>>>) | 1 |
5 | division water inlet (>>>) | 3 |
6 | earth dam (>>>) | 1 |
7 | entrance and exit portals (>>>) | 3 |
8 | fixing the downstreamh ydraulic and static calculations of hydraulic structures (>>>) | 1 |
9 | ground dam (>>>) | 3 |
10 | hydraulic and static calculations of hydraulic structures (>>>) | 2 |
11 | justification of the choice of the gate (>>>) | 3 |
12 | layout of the waterworks (>>>) | 3 |
13 | operating water discharge (>>>) | 3 |
14 | operational mine spillway (>>>) | 2 |
15 | operational spillway (>>>) | 1 |
16 | operational trench spillway (>>>) | 1 |
17 | pressurized derivational intake (>>>) | 1 |
18 | production of works (>>>) | 3 |
19 | production of works of a ground dam (>>>) | 2 |
20 | reservoir hydraulic complex (>>>) | 1 |
Facet 'Subjects'
Filter: Subjects:construction tunnel