| Title | Predictive Risk Management Model for Afghan Construction Projects Based on 4D BIM and Data Analytics: выпускная квалификационная работа магистра: направление 08.04.01 «Строительство» ; образовательная программа 08.04.01_12 «Гражданское строительство (международная образовательная программа) / Civil Engineering (International Educational Program)» |
|---|---|
| Creators | Юсофи Хедаятулла |
| Scientific adviser | Романович Марина Александровна |
| Organization | Санкт-Петербургский политехнический университет Петра Великого. Инженерно-строительный институт |
| Imprint | Санкт-Петербург, 2026 |
| Collection | Выпускные квалификационные работы ; Общая коллекция |
| Subjects | 4D BIM ; construction risk management ; project delay analysis ; afghan construction industry ; scenario-based modeling ; Building Information Modeling (BIM) ; time overrun analysis |
| Document type | Master graduation qualification work |
| Language | Russian |
| Level of education | Master |
| Speciality code (FGOS) | 08.04.01 |
| Speciality group (FGOS) | 080000 - Техника и технологии строительства |
| DOI | 10.18720/SPBPU/3/2026/vr/vr26-5582 |
| Rights | Доступ по паролю из сети Интернет (чтение) |
| Additionally | New arrival |
| Record key | ru\spstu\vkr\43072 |
| Record create date | 8/26/2026 |
Allowed Actions
–
Action 'Read' will be available if administrator prepare required files
| Group | Anonymous |
|---|---|
| Network | Internet |
This study focuses on developing a predictive 4D Building Information Modeling (4D BIM) model to analyze risks and mitigate time overruns in construction projects in Afghanistan. The research addresses several severe risks in the Afghan construction industry, such as financial constraints, contractor underperformance, supply chain disruptions, and security constraints over time. A quantitative, scenariobased methodology is developed to evaluate the impacts of individual and combined risks on the 4D model by integrating the 3D model and the project schedule. Using updated BIM tools such as Synchro 4D Pro, Revit 2027, and MS Projects, the 4D model is developed and the construction process is simulated under the scenarios to capture risk impacts on the construction project. The results demonstrate that, among the individual risk analyses (S1-S5), contractor inefficiency and project payment delays have significant impacts, while the combined scenarios (S6-S11) increase construction delays by up to 24 percent. The results highlight the importance of 4D BIM technologies for visualizing the construction process and dynamically identifying, analyzing, and monitoring risks on a construction project. The results indicate that 4D BIM significantly enhances project performance and reduces construction risks.